THE MEASUREMENT OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) VALUE ON LOW PRESSURE DIE CASTING MACHINES AS BASIC PRODUCTIVITY IMPROVEMENT CASE STUDY: PT XYZ

NAUFAL ALI FIRDAUS (2019) THE MEASUREMENT OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) VALUE ON LOW PRESSURE DIE CASTING MACHINES AS BASIC PRODUCTIVITY IMPROVEMENT CASE STUDY: PT XYZ. S1 thesis, Universitas Trunojoyo Madura.
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_Cover.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_Cover.pdf
Restricted to Repository staff only

Download (502kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter1.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter1.pdf

Download (156kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter2.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter2.pdf
Restricted to Repository staff only

Download (165kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter3.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter3.pdf
Restricted to Repository staff only

Download (145kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter4.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_Chapter4.pdf
Restricted to Repository staff only

Download (672kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_Conclusion.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_Conclusion.pdf
Restricted to Repository staff only

Download (15kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_References.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_References.pdf
Restricted to Repository staff only

Download (13kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_Appendices.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_Appendices.pdf
Restricted to Repository staff only

Download (581kB)
[thumbnail of TRUNOJOYO-Tugas Akhir-15862-150421100070_ABSTRACT.pdf] PDF
TRUNOJOYO-Tugas Akhir-15862-150421100070_ABSTRACT.pdf

Download (8kB)

Abstract

One of the problems that occurred at PT. XYZ is not achieving production targets and one of the reasons for not achieving production targets is high downtime. As a result of not achieving the production target companies often impose overtime. The reason for not achieving the production target is the low score of the effectiveness of the machine therefore the machine cannot operate optimally. Based on the calculation of the effectiveness score using the OEE method, it is known that the OEE for all LPDC machines is still below the ideal standard of JIPM (Japan Institute of Plant Maintenance), which is 85%. The biggest six big losses factor that affects the score of OEE is reducing speed losses and idling and minor stoppage losses. The recommendations given are to provide training to operators on a regular basis and improve coordination between the production department, PPIC department, production department and the die assurance department.
Keywords: OEE, Six Big Losses

Item Type Thesis (Skripsi)
Thesis Type S1
Creators
Creators
NIM
NAUFAL ALI FIRDAUS
Department Industri
Uncontrolled Keywords OEE;Six Big Losses
Divisions Fakultas Teknik > S1 - Teknik Industri
Additional Information elib mass import
Depositing User Unnamed user with email library@trunojoyo.ac.id
Date Deposited 19 Oct 2026 18:22
Last Modified 24 Oct 2026 16:53
URI https://repository.trunojoyo.ac.id/id/eprint/9158

Actions (login required)

View Item
View Item